Roof Assured installer C&G Cladding replaced a badly ageing and leaking asphalt roof, with the Sarnafil single ply membrane roofing solution, on a 1950s bungalow located in the Malvern Hills, Worcestershire.

The owners, Jon and Sarah Buckland, bought the house as a refurbishment project with a new roof being a priority. The house had been re-roofed in 1991 with asphalt but years of problems had meant patch after patch to try and halt the decline.

Sarah said: “The old roof was leaking so badly that water was pouring down the internal walls rather than the drainpipes. You could say we had a water feature down the chimney rather than in the garden!”

Based on this roof’s poor performance the couple decided ‘not to go down the asphalt route’ and researched other options, including traditional slate and tiles.

The Sarnafil membrane is said to have scored highly in terms of performance and cost but the owners also thought it was important to have the right look for the home whoich was located in a ‘scenic’ spot. They liked the colour of the lead grey membrane and this was an additional factor in choosing a Sarnafil roof.

The Bucklands then contacted C&G Cladding, a family-run business based in Cheltenham and members of the Roof Assured approved installer network for over 20 years. The C&G team installed 342m2 Sarnafil, self-adhered single ply membrane on the roof. The self-adhered hot air weldable roof membrane was developed by Sika Sarnafil in Switzerland and is said to combine all the high performance, traditional features of the Sarnafil membrane with ‘fast and easy’ installation thanks to a strong self-adhered attachment method.

Dave Anderson, joint managing director of C&G Cladding, said: “The self-adhered membrane is easy to apply with its peel, stick and seal application. This makes it ideal for a project such as the Powick bungalow where time and cost were important. There was also a considerable amount of detailing required and the self-adhered membrane gave us the extra flexibility to manage that.”

Jon and Sarah said: “C&G Cladding were fantastic. They had to put up with all sorts of delays including snow which meant they were here for longer than expected. We got to know them well and and we were sorry to see them leave when the project was finished. Their workmanship was excellent, especially as the roof required a lot of detailing and it’s all beautifully installed.”
The building control officer also commented on the installation saying: “They have done a fantastic job.”

The new roof is covered by the Sika Sarnafil 15 year guarantee.