An education in exterior laminate

When MEG Exterior grade panels were used on a Rugeley primary school’s extension, the solution was given a chance to demonstrate its famous environmental resistance from weathering to vandalism.

WeatherFAST: Why compromise on quality?

The WeatherFOLD Gutter Liner system from WeatherFast folds with ease into any existing gutter, and once welded, it becomes seamless, allowing water to flow freely towards outlets.

Vivalda produces Building Safety Act explainer for contractors

Vivalda has produced a guide for contractors and installers who are unsure of how the Building Safety Act could affect them.

New leadership embraces new opportunities for SIG division

Taking up the managing director role for SIG UK Exteriors, Chris Lodge outlines to RCI his commitment to the role, the business and ultimately, its customers.

Sustainable and ethical design with Troldtekt

There is a continuing trend towards sustainability and sustainable design being spearheaded by forward-thinking architects, designers and building product manufacturers all keen to minimise waste in the construction industry. One manufacturer who has been championing this is Danish wood wool panel supplier Troldtekt.

Fireshield chosen for science centre of Kensington and Chelsea school

Fireshield vapour permeable membrane, designed to improve the fire protection behind cladding, has been chosen for a new Science Centre at Bevington Primary school in the Royal Borough of Kensington and Chelsea, London.

Vivalda Group reflects on life after lockdown

Vivalda Group has released a series of five short videos which provide a snapshot of the industry in the wake of the COVID-19 outbreak.

Ruukki fireproofs Birmingham hotel

Ruukki has supplied fire-tested panels for the new Park Regis Hotel in Central Birmingham

Gilberts steps up to enable school to re-open

Gilberts Blackpool has teamed up with contractor Bowmer + Kirkland to overcome the impact of COVID on-site, by working together to deliver new bespoke screening louvres in less than three months.

Reducing the risk

The new project in Copenhagen will have a ski slope on the roof, walking trails and a rock-climbing wall on one side of the building, it also incorporates Kalwall cladding with explosion-venting and blast-resistant properties